Skip to content
ROCKFIELD
RU/EN

Projects · Uzbekistan

Pistali

Location
Uzbekistan · Central Uzbekistan
Commodity
Gold
Project type
Technical study (TEO / PFS)
Period
2012 — 2013

Overview

Feasibility study on the economic significance of a gold deposit: interpolation strategy, variogram analysis and multi-scenario reserve estimation.

Commodity
AuGold
Discipline
Technical & Economic Studies

Technical scope

TEO — economic significance

Technical study (TEO / PFS) · 2012 — 2013
  • Statistical analysis and interpolation strategy
  • Variogram analysis
  • Grade interpolation
  • Multi-scenario reserve estimation

Location & graphics

Marker positions are indicative, at district level.
Illustrative graphic. Not project data.AA′
Illustrative graphic. Not project data.